Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Material: | Cast Aluminum |
Still deciding? Get samples of US$ 146/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
You are buying on 100% Brand New of:
EPMAN Performance Cast Aluminum Air Intake Manifold For Mazda 3 MZR For Ford Focus Duratec 2.0/2.3 Engine TK-EM048-M3
The primary function of the intake manifold is to evenly distribute the combustion mixture (or just air in a direct injection engine) to each intake port in the cylinder head(s). Even distribution is important to optimize the efficiency and performance of the engine. It may also serve as a mount for the carburetor, throttle body, fuel injectors and other components of the engine.
Specifics and Features:
- 20% more airflow compare to stock
- Fits OEM or aftermarket throttle body
- High velocity short runner for high RPM power
- Recommend specially for mild or wild engine modification
- Ideal for turbocharged and naturally aspirated applications
Includes:
- 1 x Intake manifold
- 1 x bag of nesessary hardware
(same as the picture)
Application :
For Ford Focus 03-05 2.3L Engine.
For Ford Focus 06-07 2.3L Engine(Require Modification)
For Mazda 3 MZR L-engine 03-08
For Focus Duratec 20 2.0L/2.3L 05-07
We only sell style and quality, We sell the Orignal EPMAN Brand.
All items are Brand New unless stated otherwise on the listing. We sell DIY (Do It Yourself) Items with a few exceptions. We take no responsibility in teaching you how to install. Professional installation is strongly recommended.
1. All color in stock for fast ship.
2. Small orders will be shipped out within 72 hours. (except Chinese's Holiday)
3. Air shipment takes 5-12 working days to delivery to your hand.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: 100% as deposit, We accept Alipay West Union TT,PAYPAL. All major credit cards are accepted through secure payment processor ESCROW.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, small orders will be shipped out in 72 hours, and air shipment takes 5-12 working days to delivery. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.