Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Car Model: | N/a |
Still deciding? Get samples of US$ 70/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
You are buying on 100% Brand New of:
EPMAN Stainless Steel Exhaust Manifold Header For Nissan 200Sx / Sentra / NX Infiniti G20 2.0L 1991-2001 EPAA24G02
**** Quantity per carton : Sets ****
EPMAN Racing has meticulously crafted their Stainless Steel Exhaust Header using Mandrel Bent 100% T-201 Stainless Steel to achieve optimal performance. The Mandrel bending process effectively eliminates any kinks or bottlenecks that may impede the header's air flow, resulting in a remarkably smooth flow that translates into a discernible increase in horsepower, torque, and throttle response.
Product Feature:
Made of High Quality T201 Stainless Steel Material
4-2-1 Racing Spec. Design
Inlet / Outlet: 1.87" OD x 1.32" OD (Oval Ports)/2.39" ID
O2 Sensor and EGA Bungs Insertion; Metal Gasket Included
TIG Welded CNC Machine Flange
Increase High Flow Air, Instantly Gain 10 -15 Hp. / Tq.
Application:
For Nissan Sentra 1991-2001
For Nissan 200SX 1991-2001
For Infiniti G20 1991-2001
For Nissan NX 1991-1993
For ALL Models with 2.0L Engine Only
Package Included:
1 Set of Stainless Steel Racing Header (same as the picture)
We only sell style and quality, We sell the Original EPMAN Brand.
All items are Brand New unless stated otherwise on the listing.
We sell DIY (Do It Yourself) Items with a few exceptions. We take no responsibility in teaching you how to install. Professional installation is strongly recommended.
1. All color in stock for fast ship.
2. Small orders will be shipped out within 72 hours. (except Chinese's Holiday)
3. Air shipment takes 5-12 working days to delivery to your hand.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: 100% as deposit, We accept Alipay West Union TT,PAYPAL. All major credit cards are accepted through secure payment processor ESCROW.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, small orders will be shipped out in 72 hours, and air shipment takes 5-12 working days to delivery. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.