Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Body Material: | Aluminium |
Still deciding? Get samples of US$ 42/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
You are buying on 100% Brand New of:
EPMAN For 96-00 Honda Civic EK B/D-series Engine Swap Motor Mount Kit 2 Bolts B16 B18 EPAA12G05
Item Description
For 96-00 Honda Civic EK B/D-series Engine Swap Motor Mount Kit 2 Bolts B16 B18
Made By OEM Approved & ISO Certified Manufacturers With Materials That Meets Or Exceeds Strict OEM Requirements
Machined Made From High Grade Carbon Alloy Steel & CNC Machined Aluminum With Powder Coated Finish
Direct Replacement Of Current Motor Mounts
Solid Polyurethane Bushings With Aluminum Rod Inserts
Helps Eliminate Engine Movement Under Hard Driving Which Improves Overall Performance And Responses
Reduces Wheel Hop While Improving Acceleration & Shifting From The Transmission
Will Lessen Motor & Transmission Movement During Higher Revs Allowing More Power Out Of The Engine
No Installation Guides Are Included, We Highly Recommend To Seek Professional Installation
Features:
Premium aluminum material, wearable, firm, and has long service time.
Designed to improve the performance and efficiency of your engine greatly.
Easy and simple installation, no any complicated tools required, more convenient and reliable.
Built to meet or exceed standard specification, strictly follow factory quality control.
With the stiffer mounts, can increase traction and instant torsional moment, to reduce the movement of engine.
Specifications
Condition:100% Brand New
Material: Aluminum
Color: Silver , Other color could make by order
Fitment
Fit for Honda civic 1996-2000 B/D-series engine
Package Included
1 x Motor Mount Kit
(As pictures show)
Notes:
100% Brand New,Professional Installation is Highly Recommended.Installation Instruction is NOT Included.
1. All color in stock for fast ship.
2. Small orders will be shipped out within 72 hours. (except Chinese's Holiday)
3. Air shipment takes 5-12 working days to delivery to your hand.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: 100% as deposit, We accept Alipay West Union TT,PAYPAL. All major credit cards are accepted through secure payment processor ESCROW.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, small orders will be shipped out in 72 hours, and air shipment takes 5-12 working days to delivery. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.