Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Car Compatibility: | for All Diesel Engine Models |
Still deciding? Get samples of US$ 32/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ElectrIcal Diesel Blow Off Valve/Diesel Dump Valve/Diesel BOV EP-DBOV023
Fitment:
For Universal Application to All Diesel Engine Models
Package Includes:
1 Complete Electric Diesel Tubo Dump Vavlve Blow Off Vavlve Kit(As Shown In Picture)
Feature:
100% brand new in box
Performance Electric Diesel Turbo Blow off Valve Kit
Valve is Made of Industrial Billet Aluminum
Nice Polished & Anodized Finish
Help Eliminate compressor surge
Reduce the amount of rebuilds on your turbocharger as well as improve acceleration between gears.
Electric Controller Precisely Detects the voltage change in throttle position sensor to Trigger the Pressure Vent
Increase torque and response from your turbo between gearshifts and lower RPM
Control Module Equipped With with the latest firmware upgrade resulting in real time valve response time.
Note:
*No installation Tool & No instruction is Included, Professional Installation is Recommended*
All items are Brand New unless stated otherwise on the listing. We sell DIY (Do It Yourself) Items with a few exceptions.
We take no responsibility in teaching you how to install. Professional installation is strongly recommended.
1. All color in stock for fast ship.
2. Small orders will be shipped out within 72 hours. (except Chinese's Holiday)
3. Air shipment takes 5-12 working days to delivery to your hand.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: 100% as deposit, We accept Alipay West Union TT,PAYPAL. All major credit cards are accepted through secure payment processor ESCROW.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, small orders will be shipped out in 72 hours, and air shipment takes 5-12 working days to delivery. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.